INFRASTRUCTURE

Vehicular access to the new homes will be provided off a new roundabout on Townstal Road, with a secondary access for the employment land to the north west. The site will be permeated by a number of cycleways and footpaths, enabling sustainable travel through the development and beyond to the east.

A Sustainable Drainage System (SuDS), using both attenuation and infiltration, will be introduced to ensure that surface water runoff rates are no higher than at present. We will connect, via a new sewer, to the sewerage network on Townstal Road; South West Water has confirmed that there is the capacity to enable this.

310-1009-RM2A-Drainage-Strategy-Plan-WEB